The system is the assembly of two units whose construction is similar to single stage with inter condenser (direct contact type or surface type).
Steam of the first stage is expanded through nozzle entrains the air or other gases and discharges them to diffusers at a higher pressure in the condenser. The discharge from the first stage will then directed to condenser which reduces volume of discharge gases. These gases turn discharged with the help of second stage ejector. The ejector is required to be placed at sufficient height to drain the ejector condenser barometrically. If barometric installation is not possible then an extraction pump is provided to drain the condenser in vacuum. The discharge of exhaust steam and entrained gases is directed to the atmosphere or can be condensed by an after condenser or lead to a water tank if required.
Established in 1971, New Field has established itself as a leading engineering company. New Field has garnered more than 30 years expertise in designing and manufacturing of Ejector / Vacuum Systems, Pressure Vessels, Heat Exchangers, Storage vessels, Agitated Vessels, Turnkey solutions for Natural Gas Filtration.
More details:View company website
Its Free
Verify Now