Temporary valves are installed and two line stop taps completed
The two line stops are set and the pressure is vented downstream of both line stops
The primary line stop holds the pressure while the secondary line stop ensures a 100% safe seal
The work downstream is completed
The line stops are equalized and removed
Seal Tite® competition plugs are set and the temporary valves removed