Load Cycle Testing
NTPL make Automatic Load Cycle Test Set-up is mainly divided into two major functional units, a) Automatic AC High Voltage Test Set and b) Automatic Low Voltage High Current Injection Set.
The automatic Control Unit will enable the operator to inject high current into the cable at preprogrammed set current. Operator can also select the number of ON-OFF Cycle, duration of ON Time, duration of OFF Time and preset temperature for the complete control & monitoring of the system. The High Voltage is applied and maintained at preprogrammed level between cable conductors and shielding.
NTPL was founded in the year 1975 by Prof. Manindra Nath Basu Ray, better known as Prof. M. N. Ray, eminent Applied Physicist, after he retired from the Department of Applied Physics, Calcutta University.