Welcome to Pepagora.com, Join FreeSign In

Pre Construction Anti Termite Treatment

Chlorpyrifos 20% EC is used at recommended doses at pre construction stage can protect your valuable construction and save money for retreatment during the substantial life span of the building.

  • FOB Price
    NA
  • Min Order Quantity
    NA
  • Payment Terms
    NA
  • Share:
Request for Quote

Other Details

Chlorpyrifos 20% EC is used at recommended doses at pre construction stage can protect your valuable construction and save money for retreatment during the substantial life span of the building. Chlorpyrifos 20% ECMix 1 Ltr of Terramite IC with 19 Itr of water to get a quality chlorpyrifos emulsion having 1% active ingredient. Apply this emulsion at the suggested rate in all the following three stages  STAGE 1 Treat bottom surface and sides (upto 30cm height) of the excavations made for column pits, wall trenches and basements @5L per sq.m. of surface area.; STAGE 2 Treat the refill earth on both sides of all built up walls (approximate width 30cm and depth 45cm) @7.5L per sq.m. of vertical surface of substructure.; STAGE 3 Treat the entire leveled surface (before laying the floor) ©5L per sq.m. If necessary make 5 cm deep rod holes, 30 cm apart to facility absorption.

Images

Email to this Supplier