We are acknowledged for offering Wall Saw Cutting solutions that are developed assessment of requirements of our clients. These solutions are prepared for a concrete egress window to be track sawed. A hole needs to be dug one foot below the bottom cut line on the exterior of the foundation wall. The hole dug must be one foot past each vertical cut line and four feet back from the foundation wall.