Welcome to Pepagora.com, Join FreeSign In

Waste Tyre Industrial Recycling Equipment

Waste Tyre Recycling Plant the two keys of plant are reactor and cooling system. Reactor directly decides the machine's safety and service life. It is made by welded steel plate.

  • FOB Price
    NA
  • Min Order Quantity
    NA
  • Payment Terms
    NA
  • Share:
Request for Quote

Other Details

Waste Tyre Recycling Plant the two keys of plant are reactor and cooling system. Reactor directly decides the machine's safety and service life. It is made by welded steel plate. So the quality of welding will have a direct impact on safety and service life. Therefore, we use automatic welding machine, X rays detection and heating treatment which will not only guarantee the quality of welding but also greatly improve working efficiency. For cooling systems, there are two steps. Cooling pipe is the first step. The second is condenser. We have three condensers. And there are 57 pipes in one condenser. Diameter is 48mm for one small pipe. The heat exchanging area is about 13square meters for one condenser. So the total cooling area is about 40 square meters, which will guarantee you a high oil yield.

 

Features:

With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak

Professional heating treatment and x-ray detection chamber are especially for welding

Vacuum system will prevent oil gas from going back to reactor and causing accident

Professional thermometer, pressure gauge and safety valve. 5.It is dangerous to burn exhaust gas(C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production. 

 

Specifications:

Material: Q245R special steel plate

Thickness: 14 mm

Processing Capacity: 10Ton

High oil out put rate 45% - 52 %.

Welding: Automatic welding machine with heating treatment and x-ray detection will prolong the service life of reactor to the max

 

Environment Friendly:

Well water dedusting system can avoid black smoke

The exhaust gas will be recycled for heating reactor, no gas pollution

Every junction of the reactor is in good sealing situation with professional sealing material

 

Service:

The service life of the reactor will be 8 -10 years

 

Other Information

Pay Mode Terms: L/C (Letter of Credit), D/P (Documents Against Payment), T/T (Bank Transfer)

Port of Dispatch: nahvaseva port mumbai

Production Capacity: 10

Delivery Time: 45 days

Packaging Details: Usually It is sent in wood packing, shrink packaging sent in Containers. It has all the pipes, valves and spares necessary for the plant operation. It will be delivered upto your site in the Loree. Complete care is taken in packaging to be completely damage free. It has two 40 feet containers. It is sent via shipment through sea.

Images

Email to this Supplier